“I’m out of office until January 2.”
Every December, procurement and AOG desks see the same auto-reply. Your supplier’s holiday message is already written. Your AOG isn’t scheduled yet. 📬
Aircraft don’t observe public holidays. Airlines fly more in some weeks of the season and still need maintenance in all of them. This guide explains why December AOGs are harder to solve, what the industry is saying about parts supply right now, and how to prepare your sourcing before the next call comes in.
What Is an AOG, and Why Is December Different?
AOG (Aircraft on Ground) means an aircraft cannot fly until a fault is fixed, and in many cases the repair is waiting for a part. According to Acumen Aero’s AOG guide, each extra hour on the ground can add cancellations, passenger compensation, hotels, crew disruption, repositioning and lost revenue.
In a normal week, the sourcing steps are already demanding: confirm the part, check stock, arrange transport, complete the paperwork. In December, each step has more chances to stall:
- People are away. Sales contacts, stores and logistics teams may be on reduced cover.
- Replies are slower. Even suppliers who are open may not be monitoring the same inbox.
- Shipping gets crowded. Peak periods reduce spare capacity, and freight space is under pressure when several urgent shipments compete for it. Purolator International lists urgent capacity and limited freight availability among the main AOG shipping challenges.
What the Industry Says About Parts Supply Right Now
The market was already tight before the holidays. A recent Aviation Week report on summer AOG pressure points to several causes:
- Overhauled components staying in the repair cycle for longer, so fewer serviceable parts reach buyers
- Spare engine pools becoming thinner because engines spend more time in the shop
- Older aircraft staying in service because of aircraft delivery delays, which raises exposure to unscheduled maintenance
The report also quotes a parts marketplace, Locatory.com, saying that unscheduled-maintenance component searches rose 42% month-on-month in June. These figures come from companies in the parts trade, and the article doesn’t verify them independently, so treat them as an indicator, not a measurement.
The most useful quote for planners is this one: “Stronger contingency planning now depends on verified alternatives.” Operators are mapping in advance which suppliers hold a part, where it is, and who can deliver fastest.
Why Winter Adds Its Own Problems
Cold weather puts extra strain on operations. Aviation Week’s overview of cold-weather delays points to icy runways, deicing (including deicing fluid that can itself freeze), fuel handling and, most commonly, ground equipment failures. Many of these problems are operational and not part-related, but they show how little slack the system has in winter. When a technical fault is added on top, a holiday week has fewer options to absorb it.
The Real Holiday AOG Pain Points
- Unanswered RFQs. You email five suppliers and wait. Two don’t reply. One replies “back on the 2nd.”
- Old contact lists. The spreadsheet from 2019 has people who have since changed jobs.
- Too many channels. Email, portals, phone calls and chat groups all run in parallel, and one person has to compare everything by hand.
- Uncertain sources. Time pressure makes unverified offers look tempting. Traceability and certification still decide whether the part can be installed. As Acumen puts it, a part without proper release documents can’t be fitted, however fast it arrives.
- No visibility. You don’t know who has seen your request, so you can’t tell whether silence means “no stock” or “on holiday.”
How to Prepare Your AOG Sourcing Before the Holidays
1. Build your RFQ template now. Keep P/N, alternates, quantity, condition, certificates and delivery location ready to paste.
2. Map your suppliers by availability. Know who works during the holiday period and who doesn’t, and keep a backup for each critical part family.
3. Define your minimum paperwork. Decide which certificates you need so unsuitable offers are filtered out quickly.
4. Pre-position what you can. The Aviation Week report notes that operators are preparing support assets, such as spare engines and stands, before an aircraft is grounded.
5. Reduce your channels. One place for requests and replies is easier to manage at 3 AM than five.
6. Use verified suppliers. Verification saves time at the compliance step, when you can least afford a surprise.
One RFQ, Many Suppliers: The One-Tab Approach
This is the idea behind AOG Today: a real-time marketplace where an urgent RFQ is posted once and verified suppliers around the world can respond, not only the ones who happen to be at their desk this week. You compare live quotes in one place instead of chasing replies across email, phone and chat.
It won’t create stock that doesn’t exist, and it can’t promise that someone will answer in every time zone. What it does is widen the number of verified suppliers who see your request and put their answers side by side.
FAQ
What does AOG mean in aviation?
AOG stands for Aircraft on Ground. It describes an aircraft that cannot fly because of a technical issue, often a missing part.
Are AOG parts harder to find during the holidays?
Often, yes, because reduced staffing and busy freight capacity can slow replies and shipping. The effect varies by supplier and region, so planning ahead is the best protection.
How do I source an AOG part quickly?
Confirm the exact P/N and alternates, send a complete RFQ to several verified suppliers at once, and use one place to compare offers.
Why should I only buy from verified suppliers?
Aircraft parts need clear traceability and certification. A fast offer without correct documents can cost more time later.
What should an AOG RFQ include?
Part number, alternates, quantity, condition required, certificates required, aircraft type, delivery location and deadline.
Conclusion
The holiday auto-reply is predictable. The AOG isn’t. Teams that prepare their templates, backup suppliers and sourcing channel before December have far more options when the call comes in on the 27th.
Suppliers off for Christmas? AOG isn’t. 🎄✈️
Post your first RFQ for free at aog.today.